Page

See the most recent stories from DEVELOP3D

The latest from the DEVELOP3D Blog:

Shortfall shown in PLM user group activity

Published 28 October 2008

Posted by Stephen Holmes

Article tagged with: plm

As the time of year for surveys crashes upon us, some interesting figures are showing that only six per cent of PLM user group cooperation actually taking place.

Subsequently, 39 per cent of PLM user groups are now defunct, with fewer than 10% of the remainder having any activities planned. The survey from the Product Lifecycle Management Interest Group (PLMIG) offers reasons for the decline that include the workload placed on unpaid officers, and the lack of relevance and interest in the agenda.

A spokesperson for the PLMIG, said: “This represents a major lost opportunity for PLM implementers, because the more significant and intractable problems in PLM can be resolved only by effective exchange of ideas and methods between experienced users.”

In response to their findings the PLMIG are conducting a two-day user forum in Reading on 13-14 November, giving delegates the opportunity to present an overview of their own PLM environment as input to the discussions and generate the common material they need.

Add comment (0 comments)

Skinny HP unveiled with CAD in mind

Published 27 October 2008

Posted by Stephen Holmes

Article tagged with: hp, workstations

HP has unveiled its latest slice of technology designed with the CAD market in mind, the trim ThinClient workstation, based on the AMD Turion Dual Core 2.3-Ghz processor.

Roberto Moctezuma, vice president and general manager, desktop solutions organization, HP, said: “This latest technology from HP removes one of the last remaining barriers to transitioning to a virtual client infrastructure for customers who require the highest levels of processing power or high-quality multimedia capabilities.”

The gt7725 is shown as viewing multi-display, two- and three-dimensional MCAD designs, engineering simulation results for computational fluid dynamics and rendering images. Advanced system performance is also promised through configured dual channel memory with optimized data throughput.

Available from January, this could be a useful addition for designers wanting to work from home, pushed for space and needing a light workstation; they can also take advantage of the pre-installed HP remote graphics software. Allowing the user to work closely with remotely in a secure, collaborative environment, the system should eliminate the need to upgrade to an expensive 3D graphics card on each user’s machine.

Add comment (0 comments)

Big bird

Published 27 October 2008

Posted by Stephen Holmes

Article tagged with: cad managers

Far be it from us to stand in the way of all things art, but having seen the scale of this shiny, rather fragmented, black bird, we felt implored to comment.

This work from Mexican-based artist Carlos Amorales was completed with the aid of technology and engineering design firm Concurrent Design using technology from ZCorp printing.

Built in their Alton offices for the opening of the Yvon Lambert Gallery in London, Concurrent Design, the Bird Sculpture by Amorales is a giant piece of work. Having had a chance to handle a gleaming wing segment, we can vouch for the size of this birdy, of which the larger segments are said to be the size of a surf board.

Add comment (0 comments)

Tell us where it hurts…

Published 24 October 2008

Posted by Stephen Holmes

Article tagged with:

Are you a hard working CAD manager? Finding the office life a grind with no support, increasing numbers of staff to boss, and spending too much time converting files?

Well all of this has been noted by the fifth annual CAD Managers Survey Report that lists the major issues for the modern day CAD manager (unless you’re very happy, with a well trained tight-knit team utilising your software package to its limits – in which case why didn’t you return your survey?).

Evolve Consultancy’s report highlights five main areas of the CAD Manager’s role: management, software, support, training and CAD standards, and finds that managers have seen an increased level of responsibility in 2008, managing more staff, implementing more software packages and supporting an increased number of users than before.

Support is apparently a major bottleneck in the industry, with the average call to a support provider taking 39.3 hours (nearly five working days) to resolve. Investment in training is critical and 70 per cent of respondents noted that their main support issue was due to a lack of ability or understanding of the CAD software.

However, a key grumble taken from the report files the need to “identify and implement standard methods and procedures that can help reduce the unnecessary time compiling, formatting, translating and issuing data.”

Does this sound like the common list of woe that is tossed around between you and your fellow managers? Let us know what gets your goat.

Add comment (0 comments)

Page 671 of 692 pages « First  <  669 670 671 672 673 >  Last »